What should I do if the epoxy floor construction is blistered?
If water contacts the intermediate coat of epoxy floor paint 5 hours after application, it constitutes a major quality accident. At this point, the resin curing degree is less than 30%, and water penetration will trigger a chain destructive reaction. This guide provides a professional-level rescue plan to minimize losses to the greatest extent.
Threefold damage of water blisters to uncured floor paint
Interruption of chemical curing
Water dilutes amine curing agents, blocking the cross-linking reaction of epoxy groups, resulting in a permanent decrease in coating strength (with a measured compressive strength loss of 40%).
Disintegration of adhesion
A water film forms an isolation layer on the concrete base, destroying the mechanical anchoring effect, and the risk of subsequent hollowing increases by 300%.
Appearance defects
Capillary channels left by water evaporation (surface whitening)
Uneven curing causing cloud-like color differences (blossoming)
CO₂ dissolution forming bubble clusters
Four-level emergency response process
Step 1: Emergency drainage (initiate within 10 minutes)
Use a polyurethane water scraper to remove visible water (do not use metal tools for scraping)
Lay high-molecular water-absorbing plates in water seepage areas (water absorption ≥ 4L per 1㎡)
Step 2: Status diagnosis (30 minutes after drainage)
Damage symptoms Processing plan
Local whitening Infrared baking (50℃ for 2h) to accelerate water evaporation
Bubbles with diameter < 2cm Syringe suction + filling with epoxy repair paste
Large-area peeling/wrinkling Immediately
Step 3: Scientific drying
When humidity > 65%, use a anti-condensation dehumidifier (maintain 45% RH)
Forced ventilation requires filtering particles (to avoid contaminants embedding into the paint surface)
Step 4: Repair construction
Grind the damaged area into a 30° slope interface
Apply epoxy penetrating primer to restore the base surface activity
Apply intermediate coat paint in layers (with an 8-hour interval between each layer)
After 72 hours of curing, conduct a water test to check sealing performance
Preventive construction specifications
Environmental monitoring
Real-time monitoring of dew point temperature during construction (temperature difference for epoxy floor paint construction < 3℃)
Humidity warning value set at 75% (automatically pause construction if exceeding the standard)
Physical protection
Seal external wall openings with waterproof expansion sealant
Pre-lay drainage channel blankets on the ground (instant water absorption 10L/㎡)
Material upgrade
Select fast-curing epoxy intermediate coat paint (curing degree reaches 70% in 5 hours)